Description:
Located 18 km south to the city of Sharourah on Al-Wadia Road. The project covers a two part extension, first two (02 Nos.) new Gas Turbine Generators (GTG) each 34MW and second one (01No.) GTG of 17MW including associated Auxiliaries and Balance of Plant (BOP).
Features:
Two units of MS5001PA heavy duty Gas Turbine - the MS5001PA is a simple-cycle, single shaft gas turbine with a combustor reverse flow combustion system.
DAR Solution:
DAR’s involvement was right from pre-bid stage to complete EPCM services which included detail design, engineering management, procurement support, site supervision, civil, structural, process, piping, mechanical, instrumentation & control and electrical disciplines.
The Scope Included:
Balance of Plant design & engineering services pertaining to:
- GTG Auxiliaries,
- Fuel System,
- Raw Water System,
- Firewater System,
- Compressed Air System,
- Piping Design,
- HVAC Systems Design,
- UPS & DC System,
- Lighting and Small Power System,
- Substation Interface.
Project Highlights
Owner : SEC
Client: alfanar
Project Value: US $ 95 million (approx)
Completion Year: 2010