Project Brief

This new 380/132/13.8 kV Substation named as AL-Oraija 380/132/13.8kV BSP (#9016) is built to meet the increased load growth in AL-Oraija area, East of Riyadh city. The proposed AL-Oraija 380/132/13.8kV BSP(S/S#9016) is connected to SEC network through existing 380kV substation # 9021, S/S# 9002 and ongoing SIS# 9023 by looping in and out the existing 380kV Double circuit Over Head Transmission Line 9013-9002/9021. The Substation comprises of the following:

DAR Scope :

  • 380kV GIS with 4 diameters arranged in a one and half Breaker configuration.
  • 132kV GIS with 28 bays arranged in a double bus single Breaker configuration.
  • 13.8kV metal clad switchgear with 38 switchgear.
  • (3) Nos. 302/402/502MVA. 380/132/13.8kV Power Transformer.
  • (3) Nos. 40/50/60MVA. 132/13.8kV Power Transformer.
  • (2) Nos. 132kV, 40MVAR, Bus shunt reactor.
  • (3) Nos. 13.8kV Outdoor Shunt Capacitor Banks.