This project was to install two double circuit 380kV Underground Cables circuits along with Fiber Optic Cables between

  1. Makkah North 380kV BSP and Makkah Central 380kV BSP with an approximate route length 6.7km and
  2. Makkah West 380kV BSP and Makkah Central 380kV BSP with an approximate route length 11.9km

Technical Specifications of this project demanded close interface coordination with various other substation and cable contractors to carry out the design. DAR with its competent and experienced team successfully carried out this job in a well-coordinated manner with all the stack holders and completed the project with a very good note as per client specified requirements.

Scope:

Complete design and engineering services which includes preparation of Cable Routing - Plan & Profile, Joint bay (splicing) Locations, Design calculations for SVL selection, Cable pulling tension and Side wall pressure calculations and FOC cable routing drawings and its associated civil design for communication Hand holes / man holes, joint boxes and duct banks. Preparation of MTO, verifying / technical evaluation of vendor design submittals, technical advisory support and preparation of as built drawings.d transient overvoltage surge.